Plug in solar rules in Austria

Checked on 8 November 2026 · Confidence: medium

Inverter limit800 W
PanelsNot fixed nationally; some grid operators expect at most 800 Wp for the simple route
RegistrationNotify your grid operator at least two weeks before you start
BatteriesNotify as part of the system; details differ by grid operator
Tenants and ownersTenants: clear it with the owner first. Owner occupied flats: since 1 September 2024 consent counts as given if the other owners are informed and do not object within two months

Systems with a total output of at most 800 W per grid user count as very small generating plants (Kleinsterzeugungsanlagen, section 6 (1) no. 78 of the new Electricity Industry Act ElWG, as cited by E-Control). No permit is needed, but the grid operator must be told at least two weeks in advance, usually through its online portal. Above 800 W a grid access contract is needed.

An automatic disconnection device is required under TOR Erzeuger Type A; E-Control advises asking for a certificate of conformity from a certified test body. Never use extension leads or power strips; a fixed socket only if the maker approves it. Zero VAT on PV modules, balcony systems included, ended on 31 March 2025 (until 31 December 2025 only for contracts before 7 March 2025).

What a balcony system produces here

Yield per year in kWh
CityPanelsSouth, 35°South, verticalWest, verticalOwn use and savings (south, vertical)
Vienna800 Wp906 kWh640 kWh445 kWh408 kWh, €122.49
PVGIS 5.3 data, European Commission Joint Research Centre, calculated on 8 November 2026 with the same model as our calculator. No shade, inverter limit applied. Own use for a household of 2500 kWh a year with nobody home during the day, savings at a typical local electricity price. The Commission is not responsible for our use of the data.

Yield calculator

Guides for this country

Not yet confirmed

  • Date of entry into force of the new ElWG and whether any state currently funds plug in systems.

Sources

This is a summary for orientation, not legal advice. Rules change; check with your grid operator before you install.